01 / QUALITY REVIEW
Define the inspection scope
Share the applicable specification, required reports and any customer or third-party witness requirements when requesting a quotation.
Get a quote ↗JIADEST / FACTORY QUALITY
Factory inspection and electrical testing are completed before dispatch, with test requirements and documentation defined for each order. Agree the required inspection scope as part of your technical specification.

Laboratory staff examine samples using a microscope and benchtop instruments. Material checks support component selection and production quality control.

A technician connects portable instruments to the terminals of completed transformer units. The photograph shows electrical checks being carried out along a row of units.
FACTORY TESTING / CONTROL STATION
An operator works at the factory control console overlooking the adjoining test equipment. The control station connects the inspection workspace with the test area.
For your order, confirm the required tests, inspection arrangements and report format with our team.

01 / QUALITY REVIEW
Share the applicable specification, required reports and any customer or third-party witness requirements when requesting a quotation.
02 / QUALITY REVIEW
Inspection and electrical testing are reviewed against the equipment configuration and the agreed order requirements.
03 / QUALITY REVIEW
Identify the drawings, reports and certificate records needed for the project and destination before the delivery arrangements are finalized.
TALK TO JIADEST
Share your rated capacity, voltages, application and destination. Our team can review the configuration and documentation required for your order.