
Solar & Energy Storage Transformers ↗
PV inverter-duty step-up transformers, BESS PCS interfaces and integrated substations, with a separate auxiliary isolation-transformer series.
Explore product ↗
Get a quote ↗PROJECT REFERENCE / Wind energy
JIADEST supplied equipment for this project, as recorded on the factory project reference display. The reference identifies the 96.6 mw wind power project.
PROJECT CONTEXT
The reference above identifies the project and the scope recorded by the factory. For a new installation in this sector, transformer selection starts with the connected load, primary and secondary voltage, site layout and inspection requirements.
Explore the related application ↗Product categories below are options for reviewing a similar application. They describe the current portfolio; the historical project record does not specify a product model here.
RELATED APPLICATION EQUIPMENT
TALK TO JIADEST
Share your rated capacity, voltages, application and destination. Our team can review the configuration and documentation required for your order.